A small increase in production can  make a huge impact in  profit for Aggregate Producers.

A small increase in production can make a huge impact in profit for Aggregate Producers.

John M Pitts Jr.

BBA Finance-Texas Tech University

  • 4th Generation Aggregate Business Owner/Operator
  • 36 years of experience owning, designing, building, and operating sand/gravel/crushed stone plants. Dry pit, dredge fed, booster pump, stripping and limestone crushing operations.
  • Designed and built 6 stationary aggregate plants from 600 tph to 200 tph, including 2 greenfield sites.
  • Owned/Operated 5 portable plants at 8 sites.
  • Constructed/Reconstructed 3 dredges (Cutterhead, Chain Ladder, and Auger) Diesel and Electric and 2 Automated Boosters, Diesel and Electric.
  • Directed and participated in all facets of the company including; financial, accounting, purchasing, compliance, financing, planning, HR, sales, AR, AP, plant/machine maintenance, electrical installation, electrical repairs, IT setup/operation, engineering, legal, public relations, disaster recovery, locating greenfield/future mine sites, exploring/valuating potential deposits, strategic planning, core drilling, quality control, etc.   
  • Served as President and Vice President of Wichita Falls Chapter of CSI (Construction Specification Institute)
  • Graduate of Texas A&M Dredging Engineering Short Course
  • Extensive core drilling and exploration of existing mines and future prospects, for my company and others. (over 30 to date).
  • 10 years consulting experience.

600 TPH Dredge Fed Plant Designed and Built by John Pitts
600 TPH Dredge Fed Plant Designed and Built by John Pitts
Core Drilling Rig owned by Aggregate Consulting
Aggregate Consulting’s Exploration Core Drilling Rig
600 TPH Dry Fed Plant Designed and Built by John Pitts
600 TPH Dry Fed Plant Designed and Built by John Pitts
Diesel Chain Ladder Dredge converted to electric power by Aggregate Consulting
12 ” Diesel Chain Ladder Dredge redesigned and converted to Electric power by John Pitts
Diesel Cutterhead Dredge rebuilt by Aggregate Consulting
14″ Diesel Cutterhead Dredge Rebuilt by John Pitts
Rock Plant designed and constructed by Aggregate Consulting
Rock Plant Designed and Built by John Pitts
12" Dredge Electric Conversion Drawings by John Pitts
12″ Dredge Electric Conversion Drawings by John Pitts
Dry Fed Pit at Bowie Plant
Dry fed pit at Bowie Plant
600 TPH Dry Fed Plant designed by Aggregate Consulting
600 TPH Dry fed plant Designed and Built by John Pitts
600 TPH Dredge Fed Plant designed by Aggregate Consulting
600 TPH Dredge fed Plant Designed and Built by John Pitts